SubtitleKit
Client-side subtitle toolkit

Subtitle Sync Shifter

Subtitles 2.4 seconds late? Shift every cue at once — forwards or backwards — and check the result before you commit.

No upload — 100% in-browser Batch + ZIP Free, no account QC report included

Drop files, pick options, convert

runs in your browser
Drop subtitle files here
or click to browse · SRT · VTT · ASS · SSA · SBV · TTML · DFXP · LRC · CSV · TXT · files are processed locally

100% local: your files are read with the browser File API and never uploaded. No account, no watermark, no file-size limit.

When a constant shift is the fix

If every line is wrong by the same amount, the subtitle file was timed against a different edit: an intro was added, a recap removed, a different release was used, or the source was converted between frame rates. That is a constant offset, and shifting the whole file is the correct fix — no need to retime cue by cue.

Positive or negative, and by how much

Negative shift = subtitles appear earlier; positive shift = later. Seconds and milliseconds are both accepted (enter -2.4 or 2400ms as -2.4). Because the whole file moves together, the amount is the same as the constant error you can measure on the first cue: play the file, note how early or late line one is, enter that number.

Shift vs stretch

Verify before you ship

After shifting, the QC pass flags cues that became too short, too long or overlapping, and the preview shows the first cues with the new timings. Subtitle files that have been shifted by hand tend to accumulate exactly those defects.

FAQ

How do I know how much to shift?

Read the offset off the first line: if a cue should appear at 00:00:12 but shows at 00:00:09.5, shift +2.5 s. Then verify the last cue — if it is also +2.5 s off, a shift is the right fix.

Can I shift subtitles to start later without breaking the end?

Yes, the whole file moves as a rigid block: start times and end times both move by the same amount, so durations never change.

What if the subtitles drift progressively?

That is a stretch, not a shift. Use the frame-rate presets (23.976 → 25, 25 → 23.976, …) which multiply every timestamp by the correct ratio.

Does it work for VTT and ASS too?

Yes — any supported input can be shifted, and the output format is selected separately, so you can also use it to fix timing while converting.

Related tools